Epic simulator
Play your epic thousands of times against the calendar, the leave and the surprises, and see if the date holds. Your data stays in this browser.
Who works on this epic, and when does it start?
You need the names first, because each story gets an owner in the next step.
What has to be built, and how long can it take?
Days are working days of one person. A person works one story at a time, in the order of this table.
Paste from a spreadsheet
Columns: Id, Title, Owner, Best, Likely, Worst, Waits for. This replaces all stories. A header row is fine.
Which story waits for which?
Drag from the blue dot of a box to another box: the second story then waits for the first. Click an arrow to remove it. A box snaps to the grid when you drop it.
Pick the stories that must end before each story starts.
Who is away, and when?
Press Run to play the futures.
The chart library did not load, so this network may block cdnjs.cloudflare.com. The numbers above and the tables below still hold.
What holds up the end
How often each story sits on the chain of waits that set the end date, out of 100 futures. The story to watch is often on that chain and has the widest range between best and worst.